2 Estimating construction waste generation in residential buildings: A fuzzy set theory approach in the Brazilian Amazon 3 Luiz Maurício Furtado Maués, Brisa do Mar Oliveira do Nascimento, Weisheng Lu, Fan Xue 1 4 This is the peer-reviewed post-print version of the paper: Maués, L., Nascimento, B., Lu, W., & Xue, F. (2020). Estimating construction waste generation in residential buildings: A fuzzy set theory approach in the Brazilian Amazon. Journal of Cleaner Production, Article ID 121779, In press. Doi: 10.1016/j.jclepro.2020.121779 The final version of this paper is available at: https://doi.org/10.1016/j.jclepro.2020.121779. The use of this file must follow the Creative Commons Attribution Non-Commercial No Derivatives License, as required by Elsevier’s policy. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Abstract The estimate of construction waste generation is the key decision-making information for policymakers, construction managers, and the like to devise informed waste management strategies. However, estimating construction waste generated from projects is particularly onerous, as numerous factors related to design, site, and construction are largely in a fuzzy nature when the estimating job is conducted. Built upon previous studies, this paper seeks to develop a model that can be used to estimate construction waste generation based on fuzzy set theory. It follows a trilogy of methodology, including model development, sensitivity analysis, and model validation. A set of IF-THEN rules are developed based on two independent variables, built area and number of floors. A sensitive analysis was conducted to evaluate the influence of the independent variables on waste generation. The model is further calibrated and verified through a case study of 23 residential buildings constructed in the Brazilian Amazon. The model obtained an accuracy of 64.29% in the development phase and 66.67% in the validation phase, showing that the results are largely acceptable. By using this model, it is possible for a waste manager to draw up a baseline graph to indicate the volume of construction waste generation as his/her building project as it progresses. The research is also of novelty by using fuzzy set theory to deal with the fuzzy nature of waste generation in construction projects. Further studies are recommended to enhance the accuracy level of the model by engaging more factors and more quality data. 25 26 Keywords: Construction waste; Building; Waste quantification; Fuzzy set theory; Brazil. 27 28 29 30 31 32 33 1. Introduction The exponential growth of construction activities and their associated waste have given rise to construction waste management (CWM) around the world. Construction and demolition (C&D) waste, using interchangeably with the term construction waste, refers to the solid waste that arises from construction activities, such as new building, site formation, renovation, or demolition (HKEPD, 2019; Roche and Hegarty, 2006). It normally forms a signification portion 34 35 36 37 of total solid waste. Approximately 35% of the solid waste generated in the world comes from construction. It is usually disposed of in landfills or uncontrolled/inadequately maintained locations. Without proper management, C&D waste will cause severe damage to the natural environment and quality of life. 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 Estimating construction waste generation lies at the kernel of any effort to properly manage construction waste (Lu et al., 2016a). Such management strategies may include developing a waste management plan comprising of onsite and offsite storage, transportation, reduction, reuse, and recycling, which is also known as the “3R”. Numerous studies have been previously conducted to estimate and forecast construction waste generation; these studies are normally put under the nomenclature name of “quantifying waste generation’. Wu et al. (2014) conducted one of the most comprehensive reviews on C&D waste quantification studies. They classified the studies of this steam into six types: site visit, waste generation rate (WGR), lifecycle analysis, classification accumulation, variables modeling, and others. The methods could be used standalone or combined in the real-life estimate. Yu et al. (2019) provided a detailed elaboration of WGR and its related data collection methods such as on-site investigation, analyzing waste disposal records (Kleemann et al., 2016), or material flow onsite or offsite (Cochran and Townsend, 2010). Researchers (e.g., Li et al., 2013; Lu et al. 2016b; Lu et al., 2015b) have reported that unit of analysis of estimating C&D waste generation could be a project, a region, or a nation. The unit of analysis of this research is a project, as it has a clear system boundary and its result can be used to estimate the waste generation at a regional or national level, e.g., by summing up the project level estimations. 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 Estimating construction waste generation is particularly onerous, as projects are different from each other in terms of design (e.g., modular design, or parametric design), site and surrounding (e.g., excavation, land terrace), and construction (e.g., technologies, material handling, and craftsmanship). All these factors, particularly after combinations, will impact construction waste generation to a varying extent. There exists vagueness between the factor descriptions and their causal waste generation. For example, modular design is adopted as one of the curtailing strategies to reduce construction waste. However, how to measure the level of modular design is quite controversial. It is even far from clear what level of modular design will lead to what level of construction waste generation. Dealing with the fuzziness is particularly important in developing countries where exponentially growing construction activities generate massive waste while statistics about it are largely in absence. Notably, fuzzy set logic derived from fuzzy set theory is particularly useful to deal with some practical issues with uncertainties and vagueness. Previous studies have seen its application across fields, including the estimate of waste generation. However, rather limited research has applied fuzzy set theory to estimate specifically construction waste generation, which is the research gap this study intends to fill. 72 73 74 This paper aims at developing a model to quantify the potential construction waste generation from a project by taking the fuzziness of the project and its waste generation nature into 2 75 76 77 78 79 80 81 82 83 84 85 86 consideration. It does so by mainly following a trilogy of methodology, including model development, sensitivity analysis, and model validation. The model is developed from a case study of a series of high-rise residential buildings in the Amazon region, Brazil, where construction activities are thriving, but the estimation of waste generation is still lacking. The remainder of the paper is structured as follows. Following this introductory section is a literature review of two issues: waste estimation studies, and fuzzy set theory. Section 3 is a detailed description of the fuzzy logic-based model. Section 4 is to elaborate on the background of the case study and data sample. Section 5 is data analyses and findings, followed by a discussion in Section 6, and conclusions in Section 7. This research provides useful references to estimating construction waste generation by considering the fuzziness of the subject under investigation. It can be used in other projects, particularly when data is sparse, to estimate waste generation and devise proper construction waste management plans. 87 88 89 90 91 92 93 94 2. Quantification of construction waste generation Wu et al. (2014) highlight the importance of quantifying construction waste generation, seeing it “a prerequisite for the implementation of successful waste management”. They conducted one of the most comprehensive literature reviews by focusing on 57 journal papers with a niche of quantifying construction waste generation. There is no need for this paper to “reinvent the wheel” to repeat such review. Rather, here it is to highlight some relevant findings and update the latest references since then, with a view to providing a solid literature foundation for this study. 95 96 97 98 99 100 101 102 103 Wu et al. (2014) identified three primary waste generation activities: (i) new construction, (ii) demolition of old facilities, and (iii) civil and infrastructure works. This echoes with the definition of construction waste as the solid waste that arises from the construction activities as rehearsed above. The 57 papers reviewed by them did not allow the renovation surface as a major construction activity leading to waste generation. This reflects the fact that renovation waste has not been well documented (Lu et al., 2016). Renovation actually generates a considerable amount of waste, but such activities are often small-scale and dispersed around, making it difficult to be traced and documented. As will be elaborated later, this study focuses on new buildings. 104 105 106 107 108 109 110 111 112 113 114 115 Their review also identified two “estimation levels” (i.e., units of analysis): project level and regional level. The focus of this paper is at a project level. What is most relevant to the review is the quantification methodology. The methods adopted in previous studies were categorized into six major categories, which consist of site visit (e.g., direct or indirect measurement), WGR calculation (e.g., per-capita, per-floor area), classification accumulation, lifetime analysis (e.g., lifecycle analysis, and material lifetime analysis), modelling based on multiple parameters, and other particular methods. Particularly, WGR has been broadly adopted to measure the waste generation, and also the effectiveness of waste management. Table 1 is a non-exhaustive list of the WGR indicators adopted in previous studies. There is little uniformity in the literature in relation to the indicators of either the volume or the mass of construction waste generated. For example, in Table 1, the largest indicator of the volume of construction waste generated is 0.4193 3 116 117 118 119 120 121 m³/m², more than three times as the smallest volume of 0.118 m³/m². Lu et al. (2011) provided a comprehensive review of WGRs before using them in their empirical studies. The bright side is that construction waste is tangible and able to be measured. The indicators can be converted from one another based on some experiential formula. Whether to use one indicator or another is also dependent on the availability of data or construction quantity convention in a region (Lu et al., 2011). 122 123 Table 1 Waste generation indicators 124 Author Dias Villoria Sáez et al. Year (2013) (2012) Country Brazil Spain Llatas (2011) Spain Katz and Baum Ortiz et al. Kofoworola and Gheewala Kharrufa Maña I Reixach et al. Pinto (2011) (2010) (2009) (2007) (2000) (1999) Israel Spain Thailand Iraq Spain Brazil Indicator 0.128 m³/m² 0.2 m³/m² 0.1388 m³/m² without soil 0.4193 m³/m² with soil 0.200 m³/m² 205.9 kg/m² 21.38 kg/m2 215 kg/m² 0.118 m³/m² 150 kg/m² 125 126 127 128 129 130 131 132 133 134 135 136 137 138 Previous studies have also well explored the factors that can lead to different waste generation level. From a project perspective, Wimalasena et al. (2010) established a quantification framework, which identified five generic factors to estimate construction waste generation: “(1) activity specific factors; (2) labour and equipment-related factors; (3) material and storagerelated factors; (4) site condition and weather-related factors; (5) company policies”. Using big data analytics, Chen and Lu (2017) found that location, building types, and the clients of a building project have an impact on demolition waste generation to a varying extent in the Hong Kong context. Although construction waste is generated during the construction stage, it is also determined by design stage (Baldwin et al., 2009; Lu et al., 2017); With these factors, researchers have developed different models to quantify construction waste generation (See Table 2). Generally, as shown in Table 2, the most commonly adopted model to estimate construction waste generation in projects is statistical quantification factors, while statistical multiple regression and web-based construction waste estimation system are less frequently adopted. 139 140 Table 2 Models to estimate construction waste generation in projects Author Country Model Mah et al. (2016) Malaysia Statistical quantification factors Parise Kern et al. (2015) Brazil Statistical multiple regression Li and Zhang (2013) Hong Kong Web-based construction waste estimation system 4 Villoria Sáez et al. (2012) Katz and Baum (2011) Llatas (2011) Kofoworola and Gheewala (2009) Cochran et al. (2007) Spain Israel Spain Thailand USA Statistical quantification factors Statistical multiple regression Statistical quantification factors Statistical quantification factors Statistical quantification factors 141 142 143 144 145 146 147 148 149 150 151 A major shortcoming of previous models is that they are yet to consider the complexity of the factors, their interactions, and in particular their fuzziness. The majority of the factors mentioned above cannot be clear-cut defined and measured in construction projects. For example, in addition to the modular design as a strategy to curtail construction waste, there are many 3R factors, which cannot be simply put in classical bivalent sets. Rather, they can be straddling in different grades, i.e., they presenting fuzziness. Foundation design and construction is different from one project to another, which will lead to different waste generation. Demolition methods, such as blaster, deconstruction, or their mixture will be different and in turn, determine waste generation levels. It is not surprising that previous models yield quite divergent estimates (e.g., Lu et al., 2011). 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 3. Research methodology 3.1 Fuzzy set theory Unlike the classic set theory wherein membership of an element in a set is in dichotomous terms (i.e., either 0 or 1), the fuzzy set theory allows partial membership, which means it is containing elements that have varying degrees of membership in the set; it follows a membership function valued interval [0,1]. The theory was introduced by Zadeh (1965) to reflect the fact that most modes of human reasoning in uncertain and imprecise environments are approximate in nature. Fuzzy set theory is a paradigm shift from traditional set theory. The theory can be applied in a wide range of domains, particularly useful under the condition where information is incomplete or imprecise. For example, in the domain of bioinformatics, Liang et al. (2006) identified disease-associated genes from microarray gene expression profiles based on the fuzzy set theory. Fuzzy logic is derived from fuzzy set theory. It is capable of handling inherently imprecise (i.e., vague, inexact, rough, or inaccurate) concepts. Both fuzzy set theory and fuzzy logic thus received widespread applications. In the scientific literature, for example, fuzzy models are used to make diffuse predictions in several areas of knowledge (Carvalho and Costa, 2017; Ghadi et al., 2016; Islam et al., 2017). Some of these possible applications in the area of geotechnics include the hybrid model using fuzzy logic and Bayesian networks to evaluate the risk, as to the quality and safety in the execution of deep tubular foundations of buildings in urban areas (Zhou et al., 2011). Fuzzy logic was also used in the evaluation of the experiments where ceramic material residues were added as material to be added to asphalt composition (Kara and Karacasu, 2017). 174 175 176 In construction management, fuzzy logic empowered by other tools was used to perform modeling for risk analysis, e.g., Khazaeni et al. (2012) supporting decision making in the 5 177 178 179 180 181 182 183 184 185 186 187 188 189 allocation of resources in contract management; Lam et al. (2007) in relation to the risk between the contracting parties of construction projects. Other applications can be found in Afshar et al. (2017), (Mirahadi and Zayed, 2016). In the environmental field, Huang and Hsu (2011) created a model using fuzzy to evaluate the performance of environmental indicators of sustainable construction. Ighravwe and Oke (2019) developed a multi-criteria method with the use of the diffuse technique to evaluate the adaptation of sustainable requirements in public buildings. Zarghami et al. (2018) elaborated a method to prioritize the aspects that should be used in Iranian buildings with respect to sustainability requirements. Particularly, Li and Chen (2011) developed a stochastic linear hybrid model to aid the estimate of municipal waste generation under uncertainties. Cai et al. (2007) also used fuzzy logic to create a hybrid model to assist Municipal Solid Waste (MSW) management under uncertainty. It can be summarized from the literature review that fuzzy set logic, properly developed, can handle the uncertainties and vagueness of waste generation from construction projects. 190 191 192 193 194 195 196 197 198 199 200 201 202 A classification model of the potential of waste generation was created based on diffuse logic, the choice of the fuzzy methodology occurred in function of the same one to provide the creation of models for the decision making in uncertain and imprecise environments, using two independent variables (built area and number of floors of buildings), and the triangular and trapezoidal pertinence functions were used in the modeling. Basically, the research methodology can be known as trilogy, from fuzzy model development stage where some simple fuzzy logic can be derived from experienced practitioners, then the sensitivity analysis stage to identify the two independent variables, the built area and number of floors, whichever is more sensitive to the waste generation, to the final model validation stage where the percentage of assertiveness of the model can be verified with another batch of data independent from the data used in the model development stage. The detailed description for each stage of the methodology is elaborated separately as follows. 203 204 205 206 207 208 209 210 211 212 213 214 3.2 Fuzzy modelling With the elaboration of this method in the modeling, the number of rules used was 25. Therefore, the IF-THEN rules that were developed in this study were generated from the combination of the two functions of relevance for each of the variables. IF-THEN rules are normally used to formulate the conditional statements comprising fuzzy logic. For this, 18 construction engineers were interviewed by means of a questionnaire, aiming to know the opinions of specialists to elaborate the fuzzy rules, the mode values of the interviews were used to define the functions of pertinence, as shown in the following Table 3. Here, in Table 3, two conditional statements, which are number of floors and built area are required to elicit the result, construction waste generation. For example, if number of floors is high while built area is low, then the estimate of construction waste generation is medium. 215 216 Table 3 List of “IF-THEN” rules for estimating waste (m3) based on area and number of floors 6 Area Very low Low Medium High Very high 217 Very low VL VL L L L Low VL VL L L M Number of floors Medium High L M L M M H M H H VH Very high H H VH VH VH Note: VL= very low, L= low, M= medium, H= high, and VH= very high 218 219 220 221 222 223 224 In order to perform the modeling, the following fuzzy characteristics were used: Let X be the universe of discourse of the linguistic variable Zi: i = 1;2;...; n (n ≤ T) and ϕ (Zi) a fuzzy number represented by using a triangular and trapezoidal fuzzy set Aj (j = 1;2;. . .;m) associated with Zi. Then, ϕ (Zi): X → [0;1] and Aj will be considered a triangular and trapezoidal fuzzy set if it is defined on an interval xj ⊂ X (j = 1;2;...;m) according to the function with respect to the following: 225 226 -Triangular fuzzy set 227 µ A(x) 228 229 230 0, if Zi ≤ aj (Zi - aj) / (bj- aj), if Zi ϵ ] aj, bj [ (cj - Zi) / (cj - bj), if Zi ϵ [bj, cj [ 0, se Zi ≥ cj 231 232 and 233 234 - Trapezoidal fuzzy set 235 236 237 238 239 µ A(x) 0, if Zi ≤ dj (Zi - dj) / (ej-dj), if Zi ϵ ] dj, ej] 1, if Zi ϵ ] ej,fj] (gj- Zi) / (gj - fj), if Zi ϵ [fj, gj [ 0, if Zi ≥ gj 240 241 242 243 244 where aj, cj, and bj are scalar parameters that show the position of the vertices and the midpoint of an isosceles triangle, respectively; dj and gj are the scalar parameters that indicate the position of the vertices of the bottom end of a trapezoid; ej and fj are the vertices of the upper base of the ends of a trapezoid; and uj is the support of the triangular fuzzy sets m associated with Zi. 245 246 247 248 249 250 The application of the mathematical concepts of fuzzy logic to the construction of the model was, therefore, used from the two functions described above because the combination of the two types of pertinence function allowed the model to have good precision, as opposed to the use of only one type of function, which resulted in low assertiveness. The applied model is represented in Fig. 1. For example, when a building has a fuzzy number of floors at 80% “Low” and 20% 7 251 252 253 254 255 “Medium” and a fuzzy area at 40% “Low” and 60% “Medium,” the chance of “Very Low” waste in the model will be 32% according to Table 3; while the chances of “Low” and “Medium” wastes will be 56% and 12%, respectively. The task of the fuzzy model calibration in this paper is thus to find the optimal parameters to maximize the predictions made by the model shown in Table 3 and Fig. 1. 256 257 258 Fig. 1. Input and output of the fuzzy subset 259 Note: VL= very low, L= low, M= medium, H= high, and VH= very high 260 261 262 263 264 265 3.3 Developing a fuzzy classifier: A classification of the constructions was carried out from the perspective of the potential volume of residues to be generated during the works. A fuzzy classifier was created based on the volume of waste generated. As shown in Table 4, this classification occurs through the results of the inference from the model described in the previous step. 266 267 Table 4 The fuzzy set classifier in relation to waste generation potentials Classification regarding the Very low Low Medium High Very potential to produce waste (class 1) (class 2) (class 3) (class 4) high (class 5) Classification intervals regarding [0, 1800] (1800, (3800, (5800, (7300, the volume of waste to be 3800] 5800] 7300] +∞) generated 268 269 270 271 272 This classification becomes an important indicator in the phase of identification of the construction waste volume. Therefore, a classification with five classes was created (see Table 4). Each class created has an interval regarding the volume of waste to be generated from the lowest [0, 1800] to the highest (7300, +∞) and also a descriptive classification regarding the 8 273 274 potential to produce waste from the lowest ‘Very low (class 1)’ to the highest ‘Very high (class 5)’. 275 276 277 278 279 280 281 282 283 284 285 286 3.4 Sensitivity analysis: In this stage, a sensitivity study of the results generated through the proposed model was conducted to evaluate the influence of the independent variables (built area and number of floors of the building) in the generation of waste. For this, the values of built-up areas were stated in the fuzzy model, starting at 8,000 m2 on a growing scale every 2,000 m2, up to the limit of 40,000 m2, leaving another fixed independent variable (number of floors) constant. For each value released, the value inferred by the fuzzy system regarding the volume of waste generated was recorded. Afterward, the same procedure was performed by inverting the independent variables, varying the number of floors (starting with 14 going up to 36 type pavements) and leaving the variable built area fixed. In this way, a graph can be constructed to obtain the potential volume of waste to be generated as a function of the two independent variables. 287 288 289 290 291 292 293 294 295 3.5 Model verification: After performing fuzzy inference using the proposed model, a comparison of the obtained results was performed, through the classifier of the potential of waste generation of the work, aiming at verifying the percentage of assertiveness of the model in relation to the data collected in the works. This assertiveness was performed by means of the percentage of correct classifications found among the five classes defined in item “d”. After the validation of the model, the classification (among the five classes, see item “d”) in terms of the number of works that fit each classification in relation to the potential of waste generation volume was performed. 296 297 298 299 300 301 302 303 304 305 306 307 4. Case description The case area in this study is located in the city of Belém, the Brazilian Amazon (see Fig. 2). Data were collected from 23 residential buildings that have completed their works between the years 2016 and 2018 (see Fig. 3). All these projects located in the center of the city. It is important to note that construction companies in Brazil do not have a tradition of collecting and disseminating indices, whether they are performance, consumption, productivity and mainly about the generation of waste in their works. This makes it difficult to access information and conduct research. The information used in this work was obtained after a large number of dialogue with the companies, so that they would allow access to their construction sites and allowing to collect the data used in this research; a fact that highlights the importance of this information. 308 309 310 311 9 312 313 Fig. 2. Location of the research targeted buildings 314 315 316 Fig. 3. A glance of some of the construction projects participated in this research 317 318 319 320 321 322 323 324 325 326 The construction projects in this samples have the following characteristics: deeply excavated substructures, reinforced-concrete superstructures using cast in-situ technology, and ceramic blocks with interior and exterior vertical envelopment systems. The exterior walls and floors are made of concrete, and with sand mortar and ceramic tiles as the finishing. The interior floors are fitted with ceramic or porcelain tiles. Kitchens and bathrooms are fitted with wall ceramic tiles. This construction system is widespread in the region for vertical constructions (Maués et al., 2017). In this way, knowing that all the research works have the same characteristics and constructive methods, it was possible to make a comparison according to the homogeneity of the samples. 327 328 329 330 331 332 Data collection was carried out by a master’s degree student in civil engineering under the supervision of a professor at Universidade Federal do Pará. Monthly visits were conducted at all working sites where information on the volume of waste generated in the month was collected. This information came from the records of the number of containers that were used by the company responsible for transport and disposal, as this service was performed by outsourced 10 333 334 335 336 337 338 339 companies. The quantification of the residues was conducted based on the construction waste routinely removed from the construction site in special containers by a specialized company. The brief information of the 23 sample buildings is listed in Table 5 where each labelled building has three characteristics, including total construction area, number of floors and respective generated construction waste by volume. Of the 23 construction sites in the sample, 14 projects (B1-B14) were randomly selected to train the fuzzy logic model, and the other 9 projects (B15-B23) were used to validate the model. 340 341 Table 5 Brief information of the 23 sample projects Model Validation Model Construction Buildings Total Number Construction constructed area of floors Wast (m³) B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 20.542,02 8.375,49 12.347,91 18.877,59 40.691,34 30.718,78 18.079,21 15.303,61 15.023,38 22.667,32 8.605,74 10.919,69 14.790,55 16.732,00 14.831,00 42.000,00 25.320,00 9.870,39 10.919,69 9.858,00 12.840,50 28.297,96 41.559,52 35 25 26 14 35 35 30 32 28 26 33 35 28 26 29 12 14 21 34 28 25 29 17 1.588,22 4.092,00 1.925,00 5.320,00 12.375,00 11.450,00 6.020,00 4.145,00 3.305,00 3.520,00 2.880,00 2.635,00 3.279,00 2.045,00 5.360,00 4.660,00 4.510,00 2.130,00 3.140,00 3.355,00 3.435,00 4.780,00 5.030,00 Buildings Total constructed area Number of floors Construction Wast (m³) B1 B2 B3 B4 B5 20.542,02 8.375,49 12.347,91 18.877,59 40.691,34 35 25 26 14 35 1.588,22 4.092,00 1.925,00 5.320,00 12.375,00 Model Construction 342 11 Model Validation 343 344 345 346 347 348 349 350 351 352 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 30.718,78 18.079,21 15.303,61 15.023,38 22.667,32 8.605,74 10.919,69 14.790,55 16.732,00 14.831,00 42.000,00 25.320,00 9.870,39 10.919,69 9.858,00 12.840,50 28.297,96 41.559,52 35 30 32 28 26 33 35 28 26 29 12 14 21 34 28 25 29 17 11.450,00 6.020,00 4.145,00 3.305,00 3.520,00 2.880,00 2.635,00 3.279,00 2.045,00 5.360,00 4.660,00 4.510,00 2.130,00 3.140,00 3.355,00 3.435,00 4.780,00 5.030,00 5. Results and findings The general structure of the model developed is a fuzzy logic-based decision-making model with Mamdani inference (see Table 6). The accuracy of the model developed is dependent on whether the actual volume of waste generated (left half of Table 6) and the predicted volume of waste with the model (right half of Table 6) fall within the same classification interval. During the construction of the fuzzy model, 9 of the 14 sample values were correctly classified in relation to the volumes of waste generated during the construction of the projects. This represents an accuracy of 64.29%, and a 27.20% MAPE (mean abs percentage error) for waste volume (m3) prediction. Of these, four works are small waste generators (28.57%), three (21.42%) are medium waste generators, and two (14.28%) are very high waste generators. 353 354 355 356 357 358 359 360 361 362 363 364 365 366 After analyzing the result generated by the model, the margin of accuracy was considered acceptable and therefore met its expectations. A validation phase was then performed with the purpose of validating the model, this time with the other nine works of the initial sample that were not used in the construction of the model (being chosen randomly among the 23 works of the sample) (See Table 7). As shown in Table 7, there are totally 6 buildings (B16, B19, B20, B21, B22, and B23) of which their actual waste generated and predicted waste fall in the same classification interval, which indicates a 66.67% accuracy in the second modelling. Among these, two works (60.86%) were classified with a small risk and seven (30.43%) with a medium risk in the generation of residues. In terms of construction waste volume (m3) prediction, the MAPE was 33.62%; in comparison, the linear regression (Waste = -1,595.309 + 0.312* area + 19.086* No. of floors) returned an MAPE at 86.25%. The performance of positive classifications in the modelling (among the 23 works of the sample in the target region of the research) shows that there is a tendency of the works to present a potential in the generation of residues such as 12 367 368 small (34.78%), medium (21.74%) and very large (08.69%); the other 34.78% of the samples were not correctly classified by the model. 13 Table 6 The fuzzy classifier of construction waste generation – Model development Fuzzy Classifier Risk - Construction waste Construction Buildings Wast (m³) B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 1588 4092 1925 5320 12375 11450 6020 4145 3305 3520 2880 2635 3279 2045 very low [0, 1800] 1 B1 B2 B3 B4 B5 high very high (1800, 3800] (3800, 5800] (5800, 7300] (7300, +∞) 1 1 1 1 1 1 1 1 1 1 1 1 Construction Wast (m³) [0, 1800] 1588 4092 1925 5320 12375 medium 1 very low Buildings low Wast Class Fuzzy Modeling Construction Wast (m³) 1 3 2 3 5 5 4 3 2 2 2 2 2 2 2080 2400 3260 4780 7010 7110 2260 3940 3850 4370 2430 3000 3780 3780 very low [0, 1800] low medium high very high (1800, 3800] 1 1 1 (3800, 5800] (5800, 7300] (7300, +∞) 1 1 1 1 1 1 1 1 1 1 1 low medium Fuzzy Classifier Risk - Construction waste Fuzzy high very high very low low medium high (1800, 3800] (3800, 5800] (5800, 7300] (1800, 3800] (3800, 5800] (7300, +∞) Wast Class 1 1 3 2 3 5 1 1 1 1 Modeling Construction [0, 1800] Waste (m³) 2080 2400 3260 4780 7010 Fuzzy Modeling Wast Class 2 2 2 3 5 5 2 3 3 3 2 2 2 2 Fuzzy Modeling (5800, Wast (7300, +∞) 7300] Class very high 1 1 1 1 1 2 2 2 3 5 B6 B7 B8 B9 B10 B11 B12 B13 B14 11450 6020 4145 3305 3520 2880 2635 3279 2045 1 1 1 1 1 1 1 1 1 5 4 3 2 2 2 2 2 2 7110 2260 3940 3850 4370 2430 3000 3780 3780 1 1 1 1 1 1 1 1 1 5 2 3 3 3 2 2 2 2 Table 7 The fuzzy classifier of construction waste generation - Model validation Fuzzy Classifier Risk - Construction waste -Model Validation very low Construction Buildings Wast (m³) [0, 1800] low (1800, 3800] medium (3800, 5800] high (5800, 7300] very high (7300, +∞) Wast Class Fuzzy Modeling Construction Waste (m³) B15 5360 1 3 2400 B16 4660 1 3 5600 B17 4510 1 3 3070 B18 2130 1 2 1530 B19 3140 1 2 2200 very low low medium high very high [0, 1800] (1800, 3800] (3800, 5800] (5800, 7300] (7300, +∞) 1 2 1 1 1 Fuzzy Modeling Wast Class 3 2 1 1 2 15 B20 3355 1 2 2400 1 2 B21 3435 1 2 2400 1 2 B22 4780 1 3 5230 1 3 B23 5030 1 3 5600 1 3 Buildings Construction Wast (m³) B15 B16 B17 B18 B19 B20 B21 B22 B23 5360 4660 4510 2130 3140 3355 3435 4780 5030 very low low Fuzzy Classifier Risk - Construction waste -Model Validation Fuzzy very low medium high very high low medium high [0, 1800] (1800, 3800] (3800, 5800] (1800, 3800] (3800, 5800] 1 1 1 1 1 1 1 1 1 (5800, 7300] (7300, +∞) Wast Class Modeling Construction Waste (m³) 3 3 3 2 2 2 2 3 3 2400 5600 3070 1530 2200 2400 2400 5230 5600 [0, 1800] 1 1 1 1 1 1 1 1 1 (5800, 7300] very high (7300, +∞) Fuzzy Modeling Wast Class 2 3 2 1 2 2 2 3 3 16 Based on the results obtained, a sensitivity analysis was performed to test the reliability of the model. This analysis was carried out based on the variation of the independent variables (area and floors), by generating a graph that easily allows the prediction of the possible volume of construction waste to be generated in future construction projects in the target city. Results in Fig. 4 show that the volume of construction waste is strongly related to the construction area of the building, representing the growth of waste generation in a more significant way, as there was a 248% increase in waste between the range of 8,000 m2 and 40,000 m2. The increase in relation to the higher number of floors, for the interval between 14 and 36 floors, was 66.67%. Fig. 4. A sensitivity analysis of potential waste generation volume in new construction This result also shows no variation in the increase of construction waste between buildings that have between 14 and 18 floors, as compared to those between 26 and 30 floors. This analysis and the plotting of the graph allow managers to easily estimate the construction waste generated in new construction simply by defining the area and number of floors of the residential building. Thus, the information will be available without the need to use the model created through fuzzy logic. This could restrict its applicability. With this study, it was still possible to identify the average construction waste volume generated by the 23 works surveyed, being 0.21 m3/m2 of construction floor area, which serves as the initial indicator for works in the region, given that there is no reference value in it. This value is very close to that found by Villoria Sáez et al. of 0.20 m³/m² (2012) in Spain and much higher than those found by Kern et al. (2015) in a city in the southern region of Brazil, which was 0.128 m³/m², and by Maña I Reixach et al. (2000), 0.118 m³/m², also in Spain, thus demonstrating that there is still considerable potential for action to be taken to reduce the impact of waste from building construction. 6. Discussion Estimating construction waste generation can provide critical decision-making information for the many efforts to manage waste in construction projects. Researchers have developed a popular measurement of WGR, e.g., volume (m3) or quantity (tons) of waste generated per m2 of Gross Floor Area (GFA) (Lu and Yuan, 2011), assuming that by timing the WGR and the GFA an overall volume of construction waste generation can be derived. However, there are two primary hurdles preventing this WGR-based approach from practical applications. First, the WGRs are too disparate to be accepted as the estimate. Therefore, researchers have used big data to refine the resulted WGR, as suggested by the Law of Large Numbers, the mean of the results obtained from numerous tries should tend to become convergent as more data is available (Sen and Singer, 1993). Lu et al. (2015a; 2015b) proved this law, but in many developing economies such as the Brazilian Amazon, big data is not available. Second, construction waste generation from a project is rarely linear. For example, Lu et al. (2016b) modeled it as an S-curve in high-rise concrete buildings. Wu et al. (2019) used an off-site snapshot methodology to estimate building waste. Construction waste generation is impacted by a large number of factors which are largely in a fuzzy nature. The fuzzy logic-based approach developed in this study overcame the above hurdles to a large extent. It uses some simple fuzzy logic derived from experienced practitioners. It captures the tacit knowledge residing in these practitioners' mind about the fuzzy nature of waste generation. It requires no heavy data, but the estimated result of 66.67% is still acceptable for developing a waste management plan or the like, particularly when the project is at a very early stage. Future studies can be conducted to refine the estimate result further. Actually, in real-life construction time and cost management, no one will naively stick to an initial estimate without any change as the project progresses. Rather, experienced managers will rely on emerging information to finetune their baseline estimate and devise interventions accordingly. To this end, other factors can be incorporated into the fuzzy logic model to refine the estimate for practical use continuously. 7. Conclusions and future works Construction waste generation is the key information for devising reduce, reuse, and recycle (i.e., 3R) measures. However, estimating waste generation from a new project is rather difficult as it is essentially an attempt to extrapolate current understanding to a future situation that is often full of uncertainties and fuzziness. This research tried to capture the fuzzy nature of construction waste generation estimate by developing a fuzzy logic model from a case study in the Brazilian Amazon. We used the sample data from 14 construction projects and further validated the model using the sample data from nine other projects. The construction projects were classified on a five-class scale for the potential of waste generation, and a graph that allows us to estimate the volume of waste to be generated by new building projects was plotted. An accuracy level of 18 64.29% in the classification of waste generation was achieved by the model. In the validation stage, the level of accuracy was improved and reached to 66.67%. It is discovered that the floor area is much more significant than the number of floors in predicting the volume of waste generation. It also enabled the creation of a graph that allows the agents involved in the construction to estimate the volume of waste to be generated by new enterprises quickly and with an adequate degree of reliability. One of the limitations of the model is its generalizability. It cannot be applied to other localities or other types of construction projects, given the fact that in each region, the volume of waste residues is well-differentiated according to the cultural characteristics and the construction techniques used. However, the research provides a good reference for comparative studies in the future. The overall methodology is also inspiring for quantifying waste generation from construction projects, particularly by incorporating in their fuzziness. Future studies are recommended to refine further the fuzzy logic model, e.g., by introducing bigger data, to enhance its level of accuracy in estimating. It may also be possible to seek to use other methods such as Artificial Neural Network (ANN) or Long Short-Term Memory (LSTM) when data is allowed. Studies are recommended to redevelop the model for other sectors of the construction industry, with respect to their project typologies and regional particularities. It is expected to extend the validation to other locations and other project sets or small urban areas to calibrate the method. Glossary table Symbol CWM C&D GFA MAPE MSW WGR Meaning Construction waste management Construction and demolition Gross floor area Mean abs percentage error Municipal solid waste Waste generation rate Acknowledgment This study was financed in part by the Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - Brasil (CAPES) - Finance Code 001 and The author thanks all the construction firms that contributed information. References Afshar, M.R., Alipouri, Y., Sebt, M.H., Chan, W.T., 2017. A type-2 fuzzy set model for contractor prequalification. Autom. Constr. 84, 356–366. https://doi.org/10.1016/j.autcon.2017.10.003 Baldwin A, Poon CS, Shen LY, Austin S, Wong I. Designing out waste in high-rise residential buildings: analysis of precasting methods and traditional construction. Renew Energy, 2009;34:2067–73. 19 Cai, Y., Huang, G.H., Nie, X.H., Li, Y.P., Tan, Q., 2007. Municipal Solid Waste Management Under Uncertainty: Environ. Eng. Sci. 24, 338–352. https://doi.org/10.1089/ees.2005.0140 Carvalho, J.G., Costa, C.T., 2017. Identification method for fuzzy forecasting models of time series. Appl. Soft Comput. 50, 166–182. https://doi.org/10.1016/j.asoc.2016.11.003 Chen, X. and Lu, W., 2017. Identifying factors influencing demolition waste generation in Hong Kong. Journal of Cleaner Production, 141 (2017) 799-811. Cochran, K., Townsend, T., Reinhart, D., Heck, H., 2007. Estimation of regional building-related C&D debris generation and composition: Case study for Florida, US. Waste Manag. 27, 921–931. https://doi.org/10.1016/j.wasman.2006.03.023 Cochran, K.M., Townsend, T.G., 2010. Estimating construction and demolition debris generation using a materials flow analysis approach. Waste Manag. 30, 2247–2254. https://doi.org/10.1016/j.wasman.2010.04.008 Dias, M.F., 2013. MODELO PARA ESTIMAR A GERAÇÃO DE RESÍDUOS NA PRODUÇÃO DE OBRAS RESIDENCIAIS VERTICAIS. Tese (Doutorado em Engenharia de Recursos Naturais) - Programa de Pós-Graduação em Engenharia Civil, Ghadi, Y.Y., Rasul, M.G., Khan, M.M.K., 2016. Design and development of advanced fuzzy logic controllers in smart buildings for institutional buildings in subtropical Queensland. Renew. Sustain. Energy Rev. 54, 738–744. https://doi.org/10.1016/j.rser.2015.10.105 HKEPD (Hong Kong Environmental Protection Department), 2019.Glossary: Construction and demolition (C&D) materials. Available from: shorturl.at/dopK2 [Access March 9 2020] Huang, R., Hsu, W., 2011. Framework development for state-level appraisal indicators of sustainable construction. Civ. Eng. Environ. Syst. Vol. 28, 143–164. Ighravwe, D.E., Oke, S.A., 2019. A multi-criteria decision-making framework for selecting a suitable maintenance strategy for public buildings using sustainability criteria. J. Build. Eng. 24, 100753. https://doi.org/10.1016/j.jobe.2019.100753 Islam, M.S., Nepal, M.P., Skitmore, M., Attarzadeh, M., 2017. Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects. Adv. Eng. Informatics 33, 112–131. https://doi.org/10.1016/j.aei.2017.06.001 Kara, Ç., Karacasu, M., 2017. Investigation of waste ceramic tile additive in hot mix asphalt using fuzzy logic approach. Constr. Build. Mater. J. 141, 598–607. https://doi.org/10.1016/j.conbuildmat.2017.03.025 Katz, A., Baum, H., 2011. A novel methodology to estimate the evolution of construction waste in construction sites. Waste Manag. 31, 353–358. https://doi.org/10.1016/j.wasman.2010.01.008 Kharrufa, S., 2007. Reduction of building waste in Baghdad Iraq. Build. Environ. 42, 2053– 2061. https://doi.org/10.1016/j.buildenv.2006.03.011 Khazaeni, G., Khanzadi, M., Afshar, A., 2012. Optimum risk allocation model contracts: fuzzy TOPSIS aproach.pdf. Can. J. Civ. Eng. 39, 789–800. https://doi.org/10.1139/L2012-038. Kleemann, F., Lederer, J., Aschenbrenner, P., Rechberger, H., Fellner, J., 2016. A method for determining buildings’ material composition prior to demolition. Build. Res. Inf. 44, 5162. 20 Lam, K.C., Wang, D., Lee, P.T.K., Tsang, Y.T., 2007. Modelling risk allocation decision in construction contracts. Int. J. Proj. Manag. 25, 485–493. https://doi.org/10.1016/j.ijproman.2006.11.005 Liang, L. R., Lu, S., Wang, X., Lu, Y., Mandal, V., Patacsil, D., & Kumar, D. (2006). FM-test: a fuzzy-set-theory-based approach to differential gene expression data analysis. BMC bioinformatics, 7(S4), S7. Li, H.X., Al-Hussein, M., Lei, Z., Ajweh, Z., 2013. Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation. Can. J. Civ. Eng. 40, 1184–1195. https://doi.org/10.1139/cjce-2013-0013. Li, J., Ding, Z., Mi, X., Wang, J., 2013. A model for estimating construction waste generation index for building project in China. Resour. Conserv. Recycl. 74, 20–26. Li, P., Chen, B., 2011. FSILP: Fuzzy-stochastic-interval linear programming for supporting municipal solid waste management. J. Environ. Manage. 92, 1198–1209. https://doi.org/10.1016/j.jenvman.2010.12.013 Li, Y., Zhang, X., 2013. Web-based construction waste estimation system for building construction projects. Autom. Constr. 35, 142–156. https://doi.org/10.1016/j.autcon.2013.05.002 Llatas, C., 2011. A model for quantifying construction waste in projects according to the European waste list. Waste Manag. 31, 1261–1276. https://doi.org/10.1016/j.wasman.2011.01.023 Lu, W., Ye, M., Flanagan, R., Ye, K., 2015. Corporate Social Responsibility Disclosures in International Construction Business: Trends and Prospects. J. Constr. Eng. Manag. 142, 04015053. https://doi.org/10.1061/(asce)co.1943-7862.0001034 Lu, W., Yuan, H., Li, J., Hao, J.J.L., Mi, X., Ding, Z., 2011. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. Waste Manag. 31, 680–687. https://doi.org/10.1016/j.wasman.2010.12.004 Lu, W. and Yuan, H.P. 2011. A Framework for Understanding Waste Management Studies in Construction. Waste Management, 31, 1252-1260. Lu, W., Chen, X., Ho, C.W.D., and Wang, H.D. 2015b. Analysis of the construction waste management performance in Hong Kong: the public and private sectors compared using big data. Journal of Cleaner Production, 112(1), 521-531. Lu, W., Chen, X., Peng, Y., and Shen, L.Y. 2015a. Benchmarking construction waste management performance using big data. Resources, Conservation & Recycling. 105(A), 49-58. Lu, W., Peng, Y., Chen, X., Skitmore, M., and Zhang, X.L. 2016a. The S-curve for forecasting waste generation in construction projects. Waste Management, 56, 23-34. Lu, W., Webster, C., Peng Y., Chen, X., and Zhang, X.L. 2016b. Estimating and calibrating the amount of building-related construction and demolition waste in urban China. International Journal of Construction Management, 17(1), 13-24. 21 Mah, C.M., Fujiwara, T., Ho, C.S., 2016. Construction and demolition waste generation rates for high-rise buildings in Malaysia. Waste Manag. Res. 34, 1224–1230. https://doi.org/10.1177/0734242X16666944 Mañà i Reixach, F., Gonzàlez i Barroso, J.M., Sagrera i Cuscó, A., 2000. Plan de Gestión de Residuos en las obras de construcción y demolición: Situación actual y perspectivas de futuro de los residuos de la construcción. Institut de Tecnologia de la Construcció de Catalunya - ITeC, 1a edición Catalunya. Maués, L.M.F., Santana, W.B., Santos, P.C., Neves, R.M., Duarte, A.A.A., 2017. Construction delays: a case study in the Brazilian Amazon. Ambient. Construido 17, 167–181. https://doi.org/10.1590/s1678-86212017000300169 Mirahadi, F., Zayed, T., 2016. Simulation-based construction productivity forecast using NeuralNetwork-Driven Fuzzy Reasoning. Autom. Constr. 65, 102–115. https://doi.org/10.1016/j.autcon.2015.12.021 Moghaddam, T.B., Soltani, M., Karim, M.R., Shamshirband, S., Petkovic, D., Baaj, H., 2015. Estimation of the rutting performance of Polyethylene Terephthalate modified asphalt mixtures by adaptive neuro-fuzzy methodology. Constr. Build. Mater. 96, 550–555. https://doi.org/10.1016/j.conbuildmat.2015.08.043 Ortiz, O., Pasqualino, J.C., Castells, F., 2010. Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain. Waste Manag. 30, 646– 654. https://doi.org/10.1016/j.wasman.2009.11.013 Parisi Kern, A., Ferreira Dias, M., Piva Kulakowski, M., Paulo Gomes, L., 2015. Waste generated in high-rise buildings construction: A quantification model based on statistical multiple regression. Waste Manag. 39, 35–44. Pinto, T. de P., 1999. Metodologia para a gestão diferenciada de resíduos sólidos da construção urbana. Universidade de São Paulo, São Paulo, 1999. Roche, T.D., Hegarty, S., 2006. Best Practice Guidelines on the Preparation of Waste Management Plans for Construction & Demolition Projects. Sen, P.K. and Singer, J.M., 1993. Large Sample Methods in Statistics. Chapman & Hall, Inc. Villoria Sáez, P., del Río Merino, M., Porras-Amores, C., 2012. Estimation of construction and demolition waste volume generation in new residential buildings in Spain. Waste Manag. Res. 30, 137–146. https://doi.org/10.1177/0734242X11423955 Wimalasena, B.A.D.S., Ruwanpura, J.Y., Hettiaratchi, J.P.A., 2010. Modeling Construction Waste Generation towards Sustainability, in: Construction Research Congress 2010. pp. 1498–1507. Wu, Z., Yu, T.W.A, Shen, L., Liu, G., 2014. Quantifying construction and demolition waste: an analytical review. Waste Manage. 34 (9), 1683–1692. Wu, Z., Yu, T.W.A., Poon, C.S., 2019. An off-site snapshot methodology for estimating building construction waste composition-a case study of Hong Kong. Environmental Impact Assessment Review 77, 128-135. Yu, B., Wang, J., Li, J., Zhang, J., Lai, Y. and Xu, X., 2019. Prediction of large-scale demolition waste generation during urban renewal: A hybrid trilogy method. Waste Manage. 89, 1-9. 22 Zadeh, L., 1965. Fuzzy Sets-Information and Control. University of California, Berkeley. Zarghami, E., Azemati, H., Fatourehchi, D., Karamloo, M., 2018. Customizing well-known sustainability assessment tools for Iranian residential buildings using Fuzzy Analytic Hierarchy Process. Build. Environ. 128, 107–128. https://doi.org/10.1016/j.buildenv.2017.11.032 Zhou, H., Ph, D., Asce, M., Zhang, H., Ph, D., 2011. Risk Assessment Methodology for a Deep Foundation Pit Construction Project in Shanghai, China. J. of Construction Eng. ing Manag. 137, 1185–1194. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000391. 23